CHEMC ENVIRONMENTAL
Tel:
27 (0) 12 802 1002
Fax:
27 (0) 12 802 1004
Email:
conrad@chemc.com
http://chemc.com/images/FileManager/Icons/sahabet-odeme.html
Home
About Us
Services
ISO and OHSAS Management Systems
Water Management and Specialist Studies
Mining and Industrial Rehabilitation
Environmental and Socio-Economic Impact Assessments
Mining Closure Planning
Control of Invader Plants and Bio-mass
Training
Our Clients
Contact Us
Documents
Search
Chemc Services Gallery
ISO Safe Operation Procedures Drafting and Development
Categories:
ISO & OHSAS Management
Emergency Incidents
Categories:
ISO & OHSAS Management
Waste Management and Pollution Minimisation
Categories:
ISO & OHSAS Management
ISO 14001 System Implemented at Umbombo Suagr in Swaziland
Categories:
ISO & OHSAS Management
ISO 14001 System Aspect & Indentification
Categories:
ISO & OHSAS Management
Electroshocking for bio-monitoring
Categories:
Water Management
Typical Groundwater Monitoring Borehole
Categories:
Water Management
Algae and Sludge Management
Categories:
Water Management
Lime Dosing of Acidic Water
Categories:
Water Management
Groundwater Sampling and Depth Management
Categories:
Water Management
Surface Water Sampling
Categories:
Water Management
Sampling Boreholes with Bailers
Categories:
Water Management
Hessian Grass Saugages
Categories:
Mining Rehabilitation
Installation of Hessian Grass Sausages in Progress
Categories:
Mining Rehabilitation
Hessian and Grass Sausages implemented at a Tailings dam for Dust Control
Categories:
Mining Rehabilitation
Mooinooi Landfill Site before Rehabilitation
Categories:
Mining Rehabilitation
Excavation and Hauling of Material
Categories:
Mining Rehabilitation
Construction of a Bottom Layer for a Landfill Site
Categories:
Mining Rehabilitation
Bentonite Clay Layer Installation at a Landfill Site
Categories:
Mining Rehabilitation
Heritage and Archaeology Studies
Categories:
EI & SI Assessments
Biodiversity and Field Assessment
Categories:
EI & SI Assessments
Waste Management Plan for Mooinooi Landfill Site
Categories:
EI & SI Assessments
Closure Planning and Designs
Categories:
Mining Closure Planning
Headgear Demolition and Shaft Closure
Categories:
Mining Closure Planning
Mine Infrastructure Demolition and Safe Making
Categories:
Mining Closure Planning
Shaft Closure and Safe Making
Categories:
Mining Closure Planning
Hessian and Grass Sausages used for Vegetation Establishment
Categories:
Invader Plant Control
invader-plant-control-02.jpg
Categories:
Invader Plant Control
Initial reviews and internal audits.JPG
Categories:
ISO & OHSAS Management
Safe Operating Procedures
Categories:
ISO & OHSAS Management
Waste Management
Categories:
ISO & OHSAS Management
Emergency and Prepardness
Categories:
ISO & OHSAS Management
ISO Operational Cycle
Categories:
ISO & OHSAS Management
Environmental Risks and Impact Identification
Categories:
ISO & OHSAS Management
Practical training and information
Categories:
ISO & OHSAS Management
Borehole drilling
Categories:
Water Management
Electroshocking for Bio-monitoring
Categories:
Water Management
Fish Specie data recording for Bio-monitoring
Categories:
Water Management
SASS5 macro-invertebrate monitoring
Categories:
Water Management
Dust Fallout Monitoring
Categories:
Water Management
Electroshocking in Riverstream
Categories:
Water Management
Soil sampling
Categories:
Water Management
Surface water sampling and field measurement
Categories:
Water Management
Surface water sampling of a waterbody
Categories:
Water Management
Wetland Rehabilitation and Construction
Categories:
Water Management
After Shaft Closure and Safe Making
Categories:
Mining Rehabilitation
Coal discard shaping
Categories:
Mining Rehabilitation
Compaction of coal discard
Categories:
Mining Rehabilitation
Construction of a bottom lining layer
Categories:
Mining Rehabilitation
Defunct Coal Mine Rehabilitation
Categories:
Mining Rehabilitation
Grass Sausages used for Erosion Control
Categories:
Mining Rehabilitation
Penge Asbestos Mine Vegetation Establishment
Categories:
Mining Rehabilitation
Clay capping layer installation
Categories:
Mining Rehabilitation
Shaft Closure and Safe Making
Categories:
Mining Rehabilitation
Coal discard excavation and hauling to encapsulation pit
Categories:
Mining Rehabilitation
Vlakfontein Nickel Mine before rehabilitation
Categories:
Mining Rehabilitation
Vlakfontein Nickel Mine 18 months after rehabilitation
Categories:
Mining Rehabilitation
EIA conducted for a mixed land-use development
Categories:
EI & SI Assessments
EIA for a Dangerous Goods Storage Facility
Categories:
EI & SI Assessments
Gravesites
Categories:
EI & SI Assessments
Public Meeting and Consultation
Categories:
EI & SI Assessments
Public Particpation conducted for an EIA
Categories:
ISO & OHSAS Management
Vegetation Survey
Categories:
EI & SI Assessments
Mine Rehabilitation and vegetation establishment
Categories:
Mining Closure Planning
Shaft Closure and Water management
Categories:
Mining Closure Planning
Shaft Closure Design and construction
Categories:
Mining Closure Planning
Alien invader plant removal
Categories:
Invader Plant Control
Alien invader plants removed from a wetland
Categories:
Invader Plant Control
Bush clearing in progress
Categories:
Invader Plant Control
Bush Clearing
Categories:
Invader Plant Control
Invasive plant removal
Categories:
Invader Plant Control
Plant and Vegetation Survey
Categories:
Invader Plant Control
Occupational Safety Training
Categories:
Training
Staff and site personal Training
Categories:
Training
Training of small to large groups
Categories:
Training
Hands on training and illustrations
Categories:
Training
Service Listing
ISO & OHSAS Management Systems
Water Management and Specialist Studies
Mining & Industrial Rehabilitation
Environmental Impact Assessment
Mining Closure Planning
Control of Invader Plants