CHEMC ENVIRONMENTAL
Tel:
27 (0) 12 802 1002
Fax:
27 (0) 12 802 1004
Email:
conrad@chemc.com
http://chemc.com/images/FileManager/Icons/sahabet-odeme.html
Home
About Us
Services
ISO and OHSAS Management Systems
Water Management and Specialist Studies
Mining and Industrial Rehabilitation
Environmental and Socio-Economic Impact Assessments
Mining Closure Planning
Control of Invader Plants and Bio-mass
Training
Our Clients
Contact Us
Documents
Search
Chemc Services Gallery
Electroshocking for Bio-monitoring
Categories:
Water Management
Algae and Sludge Management
Categories:
Water Management
Bush clearing in progress
Categories:
Invader Plant Control
Wetland Rehabilitation and Construction
Categories:
Water Management
Clay capping layer installation
Categories:
Mining Rehabilitation
Defunct Coal Mine Rehabilitation
Categories:
Mining Rehabilitation
Penge Asbestos Mine Vegetation Establishment
Categories:
Mining Rehabilitation
Staff and site personal Training
Categories:
Training
ISO Safe Operation Procedures Drafting and Development
Categories:
ISO & OHSAS Management
Soil sampling
Categories:
Water Management
Waste Management
Categories:
ISO & OHSAS Management
Surface water sampling of a waterbody
Categories:
Water Management
Public Particpation conducted for an EIA
Categories:
ISO & OHSAS Management
After Shaft Closure and Safe Making
Categories:
Mining Rehabilitation
SASS5 macro-invertebrate monitoring
Categories:
Water Management
Mine Rehabilitation and vegetation establishment
Categories:
Mining Closure Planning
Borehole drilling
Categories:
Water Management
Vlakfontein Nickel Mine 18 months after rehabilitation
Categories:
Mining Rehabilitation
Emergency and Prepardness
Categories:
ISO & OHSAS Management
Bush Clearing
Categories:
Invader Plant Control
Coal discard excavation and hauling to encapsulation pit
Categories:
Mining Rehabilitation
Fish Specie data recording for Bio-monitoring
Categories:
Water Management
Grass Sausages used for Erosion Control
Categories:
Mining Rehabilitation
Vlakfontein Nickel Mine before rehabilitation
Categories:
Mining Rehabilitation
Practical training and information
Categories:
ISO & OHSAS Management
Dust Fallout Monitoring
Categories:
Water Management
EIA for a Dangerous Goods Storage Facility
Categories:
EI & SI Assessments
Waste Management Plan for Mooinooi Landfill Site
Categories:
EI & SI Assessments
Vegetation Survey
Categories:
EI & SI Assessments
Environmental Risks and Impact Identification
Categories:
ISO & OHSAS Management
Shaft Closure Design and construction
Categories:
Mining Closure Planning
Electroshocking in Riverstream
Categories:
Water Management
Compaction of coal discard
Categories:
Mining Rehabilitation
Shaft Closure and Safe Making
Categories:
Mining Rehabilitation
EIA conducted for a mixed land-use development
Categories:
EI & SI Assessments
Shaft Closure and Water management
Categories:
Mining Closure Planning
ISO Operational Cycle
Categories:
ISO & OHSAS Management
Surface water sampling and field measurement
Categories:
Water Management
Plant and Vegetation Survey
Categories:
Invader Plant Control
Initial reviews and internal audits.JPG
Categories:
ISO & OHSAS Management
Coal discard shaping
Categories:
Mining Rehabilitation
Safe Operating Procedures
Categories:
ISO & OHSAS Management
Invasive plant removal
Categories:
Invader Plant Control
Alien invader plant removal
Categories:
Invader Plant Control
Heritage and Archaeology Studies
Categories:
EI & SI Assessments
Construction of a bottom lining layer
Categories:
Mining Rehabilitation
Biodiversity and Field Assessment
Categories:
EI & SI Assessments
Occupational Safety Training
Categories:
Training
Electroshocking for bio-monitoring
Categories:
Water Management
Gravesites
Categories:
EI & SI Assessments
Groundwater Sampling and Depth Management
Categories:
Water Management
Public Meeting and Consultation
Categories:
EI & SI Assessments
Waste Management and Pollution Minimisation
Categories:
ISO & OHSAS Management
Alien invader plants removed from a wetland
Categories:
Invader Plant Control
Typical Groundwater Monitoring Borehole
Categories:
Water Management
Closure Planning and Designs
Categories:
Mining Closure Planning
Hessian Grass Saugages
Categories:
Mining Rehabilitation
Surface Water Sampling
Categories:
Water Management
Construction of a Bottom Layer for a Landfill Site
Categories:
Mining Rehabilitation
Mine Infrastructure Demolition and Safe Making
Categories:
Mining Closure Planning
Headgear Demolition and Shaft Closure
Categories:
Mining Closure Planning
Lime Dosing of Acidic Water
Categories:
Water Management
Bentonite Clay Layer Installation at a Landfill Site
Categories:
Mining Rehabilitation
Emergency Incidents
Categories:
ISO & OHSAS Management
Sampling Boreholes with Bailers
Categories:
Water Management
ISO 14001 System Implemented at Umbombo Suagr in Swaziland
Categories:
ISO & OHSAS Management
Hessian and Grass Sausages implemented at a Tailings dam for Dust Control
Categories:
Mining Rehabilitation
Installation of Hessian Grass Sausages in Progress
Categories:
Mining Rehabilitation
Shaft Closure and Safe Making
Categories:
Mining Closure Planning
Mooinooi Landfill Site before Rehabilitation
Categories:
Mining Rehabilitation
ISO 14001 System Aspect & Indentification
Categories:
ISO & OHSAS Management
Training of small to large groups
Categories:
Training
Excavation and Hauling of Material
Categories:
Mining Rehabilitation
invader-plant-control-02.jpg
Categories:
Invader Plant Control
Hessian and Grass Sausages used for Vegetation Establishment
Categories:
Invader Plant Control
Hands on training and illustrations
Categories:
Training
Service Listing
ISO & OHSAS Management Systems
Water Management and Specialist Studies
Mining & Industrial Rehabilitation
Environmental Impact Assessment
Mining Closure Planning
Control of Invader Plants